How to Select the Best Overhead Crane Supplier for Heavy Industries in 2026: A Comprehensive Guide for Global Buyers
Июл 10, 2026
In 2026, sourcing a reliable overhead crane supplier for heavy industries is more critical than ever. Supply chains have shifted, industrial output in emerging markets is accelerating, and the cost of downtime has never been higher. Whether you operate a steel mill in Brazil, a mining complex in Russia, a shipyard in Indonesia, or a petrochemical plant in Saudi Arabia, the crane partner you choose will directly influence your operational safety, productivity, and profitability for the next 15 to 20 years. This guide draws on over two decades of hands-on manufacturing experience at China’s largest crane production base—the biggest and most famous crane manufacturing base in China—to help distributors, wholesalers, and end users in South America, Russia, Southeast Asia, the Middle East, and South Africa make a fully informed decision. We cover technical requirements, regional supplier comparisons, common pitfalls, a step-by-step vetting methodology, real-world cost data, and future trends, all designed to give you an actionable advantage.
Understanding Heavy Industry Overhead Crane Requirements
What Defines a Heavy-Duty Overhead Crane? Key Specifications and Classifications
A heavy-duty overhead crane is not simply a larger version of a standard workshop crane. The classification system according to FEM (Fédération Européenne de la Manutention) and ISO 4301 groups cranes into duty classes from A1 (light) to A8 (very heavy). For heavy industries—steel, mining, shipbuilding, cement, and large-scale manufacturing—you typically need cranes in the A5 to A8 range, capable of handling high load spectra, frequent starts, and continuous operation.
Key specifications to define include:
- Safe Working Load (SWL): Ranges from 10 tonnes to over 500 tonnes for heavy applications.
- Span: The distance between runway rails, often exceeding 30 meters in large industrial halls.
- Lifting height: Can reach 20 meters or more, especially in power plants and shipyards.
- Hoisting speed and cross-travel speed: Must be matched to the duty cycle; a steel mill charging crane may require speeds of 10–20 m/min with precise control.
- Work environment temperature: From -40°C in Russian mining sites to +80°C near furnaces.
Classifying the crane correctly from the outset prevents structural fatigue and motor burnout. For example, a crane specified as A5 but operated at A7 load levels will likely suffer girder cracking within 5 to 7 years. Always ask your supplier to provide the FEM/ISO classification documentation, not just a nominal capacity figure.
Industry-Specific Demands: Steel, Mining, Shipbuilding, and More
Different heavy industries impose unique stresses on overhead cranes. In an integrated steel plant, ladle cranes handle molten metal at temperatures exceeding 1,200°C, requiring heat shields, refractory protection, and redundant braking systems. A failure here is not just costly—it is a safety catastrophe. Mining applications, especially in South Africa and Russia, demand dust-proof enclosures, reinforced electrical panels, and corrosion-resistant coatings to withstand abrasive environments and extreme cold. Shipyards in Southeast Asia often need gantry cranes with very high lifting capacities and wide spans to assemble massive hull sections; here, synchronization of multiple hoists is critical.
For heavy industries in the Middle East, such as oil and gas fabrication yards, cranes must comply with additional explosion-proof standards (ATEX or IECEx) and endure high ambient temperatures without derating. When we configure a crane for a specific industry, our engineering team maps every environmental factor—temperature, humidity, dust, chemical exposure—onto the component selection matrix, from gearbox seals to control panel IP ratings. This level of customization is rarely available from local assembly shops that rely on a one-size-fits-all design.
Common Misconceptions About Lifting Capacity and Duty Cycle
One of the most persistent myths among first-time buyers is that the crane’s Safe Working Load alone defines its capability. In reality, the duty cycle—how often and for how long the crane lifts near its maximum load—determines the structural and mechanical durability. A 50-tonne crane used 2 hours per day in a warehouse has a vastly different life expectancy than a 50-tonne crane loading scrap into a furnace 16 hours per day.
Another misconception is that all suppliers quote the same capacity based on the same standards. Some manufacturers quote the static load capacity without factoring in dynamic factors like impact and lateral forces. We have seen cases where a crane advertised as “50 tonnes” actually had a safe working load of only 42 tonnes under real operating conditions. Always request the load chart and FEM/ISO classification, and verify that the quoted capacity includes the appropriate dynamic coefficient (typically 1.15 to 1.4 for heavy duty).
The Global Landscape of Overhead Crane Suppliers in 2026
Why China Remains the Dominant Manufacturing Base
By 2025, China accounted for an estimated 68% of global overhead crane production by volume, according to data from the China Heavy Machinery Industry Association. The concentration of raw material supply, specialized welding expertise, and integrated component manufacturing—from motors and gearboxes to control systems—gives Chinese manufacturers a structural cost advantage of 20–35% over European or North American suppliers, while maintaining comparable quality for most industrial applications. The largest manufacturing bases, such as the one we operate, span over 500,000 square meters and house automated cutting lines, robotic welding stations, and full-scale load testing platforms capable of testing up to 600 tonnes.
This scale allows for rapid customization: a complex double-girder overhead crane for a heavy industry project can be designed, fabricated, and shipped within 12–16 weeks, compared to 20–30 weeks from many Western competitors. Furthermore, Chinese crane exporters have significantly improved after-sales infrastructure in key markets, with spare parts warehouses in Dubai, São Paulo, and Jakarta, and local service partners trained by factory engineers.
Regional Supplier Analysis: South America, Russia, Southeast Asia, Middle East, South Africa
Buyers in different regions face distinct trade-offs when choosing between local, European, and Chinese suppliers. The table below summarizes key comparison points based on our 2025–2026 project data:
| Factor | Chinese Heavy Industry Crane Supplier | Local/Regional Supplier | European Supplier |
|---|---|---|---|
| Price index (100-tonne double girder) | 100% | 130–160% | 180–250% |
| Delivery time (ex-works) | 12–16 weeks | 14–20 weeks | 20–30 weeks |
| Customization flexibility | Высокий | Средний | Medium-High |
| Compliance with local standards | Good (CE, GOST, NR-12, SANS) | Native | CE, others on request |
| Spare parts availability in region | Growing hub network | Good | Good but expensive |
| Service response time | Via local partners | Fast | Slow outside Europe |
For South America, especially Brazil and Chile, Chinese suppliers have gained significant market share by offering NR-12 compliant designs with local engineering support. In Russia, the EAC certification process is now well understood by major Chinese exporters, and cold-climate packages (-40°C rated steel, low-temperature lubricants) are standard. Southeast Asian buyers benefit from short sea freight times and cultural familiarity; our Singapore and Thailand projects frequently combine overhead cranes with gantry crane systems for integrated yard and workshop lifting. The Middle East demands high-speed delivery for oil and gas projects, where Chinese manufacturers have proven capable of meeting aggressive schedules. South Africa’s mining sector requires robust designs with SANS 1516 compliance, and Chinese factories have adapted their welding procedures accordingly.
Emerging Trends: Automation, IoT, and Green Lifting Solutions
The heavy industry crane market in 2026 is being reshaped by three technology trends. First, automation: fully automated overhead cranes with laser positioning and anti-sway control are now deployed in steel coil warehouses and aluminum smelters, reducing cycle times by up to 25% and eliminating human error. Second, IoT-enabled predictive maintenance: sensors on gearboxes, motors, and wire ropes stream data to cloud platforms that predict failures 2–4 weeks in advance, reducing unplanned downtime by an average of 35% according to a 2025 study by the FEM. Third, energy efficiency: regenerative braking systems on hoists can recover 15–30% of lifting energy and feed it back into the grid, a feature increasingly requested by European-owned plants in Southeast Asia and South America. As a forward-looking промышленный кран manufacturer, we have incorporated these technologies into our new X-Series heavy-duty line, which debuted in early 2025.
7 Critical Mistakes When Choosing an Overhead Crane Supplier
Mistake #1: Prioritizing Price Over Lifecycle Cost
The temptation to accept the lowest bid is strong, especially when two quotations for a “50-tonne double girder overhead crane” can vary by 40%. However, the purchase price represents only 20–25% of the total cost of ownership over a 15-year lifespan. The remaining 75–80% comes from energy consumption, maintenance, spare parts, and production losses due to downtime. A crane with a cheap gearbox may save $8,000 upfront but cost $50,000 in replacements and lost production over a decade. Always request a lifecycle cost analysis that includes mean time between failures (MTBF) data for critical components.
Mistake #2: Ignoring After-Sales Support and Spare Parts Availability
In 2023, a distributor in Southeast Asia ordered 20 electric hoists from a low-cost supplier without checking spare parts availability. When a motor failed in a remote Indonesian mine, the replacement part took 14 weeks to arrive because the supplier had no regional stock. The mine lost an estimated $180,000 in production. We learned from this case and now mandate that every heavy industry crane proposal includes a recommended spare parts list with guaranteed delivery times. For our key markets, we maintain consignment stocks in São Paulo, Dubai, and Moscow. Before signing a contract, ask the supplier to show you a live inventory dashboard for your region.
Mistake #3: Overlooking Compliance with Local Safety Standards
Every country in your target market has specific crane safety regulations. Brazil’s NR-12 requires detailed risk assessments and Portuguese-language documentation. Russia’s EAC certification demands specific material certificates and testing protocols. South Africa’s SANS 1516 governs the design of overhead travelling cranes. A crane that is CE-marked but not EAC-certified will be stopped at Russian customs. We have seen shipments held for months because the supplier assumed CE covered all markets. Always provide your supplier with the exact regulatory requirements and ask for proof of past compliance—such as copies of previous certificates for the same market.
Mistake #4: Not Visiting the Factory or Conducting Audits
I recall a 2024 audit I conducted for a Russian mining client at a competitor’s facility. The sales photos showed a modern factory, but the on-site inspection revealed that the welding bays lacked climate control, and the steel plates were stored outdoors with visible rust. Ultrasonic testing of a sample girder uncovered internal lamination defects that would have led to fatigue cracks within 3 years. The client canceled that order and placed it with us, where all welding is performed in temperature-controlled halls and every critical weld undergoes UT or radiographic inspection. A factory visit—or at least a structured video audit—is non-negotiable for heavy industry projects. Use the checklist in the Tools section of this guide.
Mistake #5: Neglecting Environmental Factors (Temperature, Humidity, Corrosion)
Heavy industries operate in extremes. A crane designed for a temperate climate will fail prematurely in a Russian winter or a Saudi summer. Key components that must be specified for the environment include electric motors (insulation class H for high temperature, class F with heaters for cold), control panels (IP54 minimum, IP65 for dusty or wet areas), and structural steel (Charpy impact test values for low-temperature toughness). In coastal areas of South Africa or Southeast Asia, specify C4 or C5 corrosion protection according to ISO 12944, with epoxy zinc-rich primers and polyurethane topcoats. Not doing so results in structural corrosion that can reduce the crane’s service life by 40–60%.
Mistake #6: Underestimating Installation and Commissioning Complexities
A heavy-duty overhead crane weighing 80 tonnes cannot be simply “bolted together” on site. Installation requires precise alignment of runway rails, torque-controlled bolting of girder splices, and calibrated load testing. We have seen projects where the buyer saved $15,000 by using a local unqualified crew, only to have the crane derail during load testing, damaging the runway and delaying plant startup by 6 weeks. Always include installation supervision by the manufacturer’s engineers in the contract, and insist on a formal commissioning report with load test certificates.
Mistake #7: Choosing a Supplier Without Regional References
A supplier may have a strong reputation in its home market but no experience exporting to your region. Differences in electrical standards (60 Hz in parts of South America and the Middle East vs. 50 Hz in Russia), logistics, and local regulations can derail a project. Request at least three references from your region where the supplier delivered a crane of similar capacity and duty class. Contact those references directly and ask about delivery punctuality, documentation quality, and after-sales support. This single step has saved our clients from costly mismatches more times than any other.
A Step-by-Step Methodology to Vet an Overhead Crane Supplier
Step 1: Define Your Technical Requirements with a Spec Sheet Template
Before contacting any supplier, complete a detailed specification sheet. This forces clarity and ensures comparable quotations. Your spec sheet should include:
- Lifting capacity (main hoist / auxiliary hoist) in tonnes
- Span between rails (m)
- Lifting height (m)
- Duty class (FEM 1Am–4m or ISO A3–A8)
- Operating environment: min/max temperature, humidity, dust, corrosive agents
- Power supply: voltage, phase, frequency
- Control type: pendant, radio remote, or automated
- Special requirements: explosion-proof, heat shield, redundant brakes, etc.
- Applicable standards: CE, EAC, NR-12, SANS, etc.
Providing this template to three or four shortlisted suppliers will immediately reveal who asks intelligent follow-up questions and who simply sends a generic price. The quality of their technical queries is a strong predictor of the final product quality.
Step 2: Request and Evaluate a Detailed Quotation
A professional quotation for a heavy industry overhead crane should be 15–30 pages long and include:
- General arrangement drawing with main dimensions
- Component specifications: hoist model, motor brand and power, gearbox type, brake model, wheel material
- Structural steel grade and plate thicknesses
- Surface treatment and paint system
- Electrical single-line diagram and control philosophy
- List of included spare parts and recommended optional spares
- Delivery terms (Incoterms 2020) and packing details
- Installation and commissioning scope
- Warranty period and conditions
Compare quotations line by line, not just the bottom-line price. A missing item like “radio remote control” or “load cell” can add $8,000–15,000 later. We advise clients to create a comparison matrix in Excel to objectively score each offer.
Step 3: Audit Manufacturing Capabilities Remotely and On-Site
If an on-site visit is not feasible, conduct a structured video audit. Ask the supplier to show you live video of:
- Steel plate storage and pretreatment (shot blasting, priming)
- Cutting and welding bays (look for automated plasma cutting, submerged arc welding machines)
- Non-destructive testing (NDT) equipment and certified operators
- Gearbox and motor test benches
- Load testing platform with calibrated load cells
During a 2025 remote audit for a Middle Eastern client, our engineers walked the client through our entire production line via a 2-hour video call, showing real-time UT inspection of their crane’s main girder welds. The client later told us this transparency was the deciding factor. If a supplier hesitates to show certain areas, treat that as a red flag.
Step 4: Verify Certifications and International Compliance
Request copies of the supplier’s ISO 9001, ISO 14001, and ISO 45001 certificates, and verify their validity on the certification body’s website. For specific markets, ask for evidence of past compliance: a copy of a GOST certificate for Russia, an NR-12 ART (Technical Report) for Brazil, or a SANS 1516 design verification for South Africa. A reputable heavy industry crane supplier will have a dedicated compliance engineer who can produce these documents within days.
Step 5: Check References and Case Studies from Your Region
Ask for a list of at least five projects of similar capacity and duty class delivered in the last three years, preferably in your region. Contact at least two of these customers independently. Key questions to ask:
- Was the crane delivered on time and complete?
- How did the actual performance compare to the specifications?
- How responsive was the supplier to technical questions and warranty claims?
- Would you buy from this supplier again?
This exercise takes a few hours but can prevent a million-dollar mistake. In our experience, customers who skip this step are three times more likely to encounter post-installation problems.
Cost vs. Value: Understanding Overhead Crane Pricing and ROI
Price Breakdown: Components, Shipping, Installation, and Maintenance
For a typical 100-tonne double girder overhead crane (A6 duty, 25 m span, 16 m lift), the ex-works price from a Chinese heavy industry crane supplier ranges from $180,000 to $280,000 depending on component brands and customization. The approximate cost breakdown is:
- Structural steel (girders, end carriages, platforms): 30–35%
- Hoisting machinery (hoist, motors, gearboxes, brakes, wire rope): 25–30%
- Electrical and control systems (VFD drives, PLC, sensors, cabling): 15–20%
- Surface treatment and painting: 5–8%
- Factory testing and certification: 3–5%
- Engineering and documentation: 5–7%
- Packaging: 2–3%
Sea freight to Santos, Brazil, or Durban, South Africa, adds 8–15% depending on volume. Installation and commissioning by the manufacturer’s supervisor typically costs $25,000–$45,000 including travel and per diem. A comprehensive spare parts package for the first two years adds another 5–8%.
ROI Calculation: How a Reliable Crane Saves Millions Over 15 Years
Consider a steel mill that operates 6,000 hours per year. A high-quality A7 overhead crane with a 99% uptime guarantee versus a budget crane with 92% uptime results in 420 fewer lost production hours annually. At a conservative production value of $5,000 per hour, that difference is worth $2.1 million per year. Over 15 years, the reliable crane generates an additional $31.5 million in production output, dwarfing the initial $150,000 price difference. Add energy savings from high-efficiency drives (typically 12–18% reduction in kWh per lift) and reduced maintenance labor, and the net present value of choosing a quality supplier becomes overwhelmingly positive. We provide a customized ROI calculator to all serious buyers; request it with your inquiry.
Hidden Costs of Choosing the Wrong Supplier
Beyond downtime, a substandard crane incurs hidden costs: accelerated runway wear due to misaligned end carriages, higher insurance premiums due to safety incidents, regulatory fines for non-compliance, and the administrative burden of managing frequent repairs. One chemical plant in Saudi Arabia faced a $500,000 fine in 2024 when a crane failed during a critical lift and caused an environmental spill. The root cause was an undersized gearbox that had been substituted without the buyer’s knowledge. These costs never appear on the purchase invoice but can bankrupt a project.
Case Study: How a South American Steel Mill Saved 18% on Lifting Operations
The Challenge: Aging Crane Fleet and Frequent Downtime
In 2023, a large steel mill in Minas Gerais, Brazil, was struggling with three 20-year-old overhead cranes in its melt shop. The cranes suffered an average of 12 unplanned stoppages per year, each lasting 8–24 hours. Maintenance costs had risen to $340,000 annually, and spare parts for the obsolete European motors were increasingly hard to source. The mill’s production target was being missed by 7% due to crane-related delays.
The Solution: Partnering with a Chinese Overhead Crane Supplier for Heavy Industries
After a competitive tender involving five suppliers, the mill selected our engineering proposal for two new 120-tonne A7 ladle cranes with heat shields, redundant brakes, and Siemens VFD drives. The design incorporated lessons from our previous steel mill projects: reinforced girder connections for thermal cycling, air-conditioned operator cabins, and a condition monitoring system with 42 sensors per crane. The order included a 3-year spare parts package, installation supervision, and NR-12 compliance documentation in Portuguese.
The Results: 18% Cost Reduction, 99.2% Uptime in 2025
The cranes were commissioned in March 2025. By December 2025, the mill reported:
- Unplanned downtime reduced from 12 incidents/year to 1 minor incident (a limit switch adjustment).
- Overall lifting operation costs (energy + maintenance + labor) down 18% compared to the old fleet.
- Uptime reached 99.2%, enabling the mill to exceed its production target by 4%.
- ROI on the crane investment was achieved in 14 months, well ahead of the projected 22 months.
This case illustrates that a technically superior crane, even if not the cheapest, delivers measurable financial returns in heavy industries where uptime is everything.
Tools and Resources for Heavy Industry Buyers
Crane Configuration Software and Online Calculators
Several free and commercial tools can help you define your crane requirements before engaging suppliers. The FEM lifting equipment selection tool (available on the FEM website) guides you through duty class selection based on load spectrum and operating hours. Our own online crane configurator, accessible to registered buyers, generates a preliminary specification and 3D layout drawing in under 10 minutes. For ROI estimation, we offer an Excel-based calculator that factors in your local energy costs, labor rates, and production value to project total cost of ownership.
Inspection Checklist for Factory Visits
Use this checklist when auditing a potential supplier’s facility, whether in person or via video:
- Steel storage: Is it covered, organized by grade, with traceability to mill certificates?
- Cutting: Are CNC plasma or laser cutters used? Check edge quality and dimensional accuracy.
- Welding: Look for SAW (submerged arc welding) machines for main girders, and qualified welders with visible certification badges.
- NDT: Is there an in-house UT, MT, or RT capability? Ask to see recent test reports.
- Machining: Are gearbox housings and wheel bores machined on CNC boring mills?
- Assembly and testing: Is there a dedicated load testing bay with calibrated weights or hydraulic actuators?
- Quality records: Ask to see the traceability file for a recently completed crane—from steel mill certificates to final inspection reports.
Suppliers that score well on this checklist consistently deliver reliable heavy industry cranes.
Industry Standards and Reference Documents
Familiarity with the following standards will make you a more informed buyer:
- ISO 4301: Cranes — Classification
- ISO 9001: Quality management systems
- FEM 9.001: Rules for the design of series lifting equipment
- FEM 9.755: Measures for achieving safe working periods of lifting equipment
- ASME B30.2: Overhead and Gantry Cranes (widely referenced in South America and the Middle East)
- NR-12 (Brazil): Safety in machinery and equipment
- GOST 32575 (Russia): Cranes — General technical requirements
- SANS 1516 (South Africa): The design of overhead travelling cranes
Request that your supplier explicitly state which standards they design and test to, and provide conformity declarations.
Future-Proofing Your Investment: Trends to 2030
Smart Cranes with Predictive Maintenance
By 2028, an estimated 40% of new heavy industry cranes will ship with embedded IoT sensors, according to a 2025 forecast by Roland Berger. These systems monitor vibration, temperature, and load cycles on critical components, feeding data into machine learning algorithms that predict remaining useful life. For a steel mill, this means scheduling a gearbox replacement during a planned outage rather than reacting to a midnight failure. When evaluating suppliers, ask if their control system architecture supports OPC UA or MQTT protocols for integration with your plant’s data infrastructure.
Sustainable Manufacturing and Energy-Efficient Hoists
Environmental regulations in South America and Southeast Asia are tightening, and European parent companies increasingly demand carbon footprint data from their suppliers. Chinese crane manufacturers are responding with energy-efficient IE4 motors, regenerative drives that recover braking energy, and paint systems with low VOC emissions. In 2026, specifying an energy-efficient hoist can reduce a crane’s electricity consumption by 20–30%, directly lowering operating costs and supporting ESG reporting. Request an energy performance certificate from your supplier.
Modular Designs for Easy Expansion
Heavy industry plants often expand in phases. A modular crane design with bolted girder splices and standardized components allows you to increase span or capacity later without replacing the entire crane. This approach saved a cement plant in Vietnam 40% on its expansion cost when it needed to widen its production hall in 2025. Discuss future expansion plans with your supplier during the design phase; retrofitting a non-modular crane is 3–5 times more expensive than planning for it upfront.
Your Next Steps: From Inquiry to Installation
How to Initiate a Technical Consultation
Start by sending your completed spec sheet and a brief description of your operation to the supplier’s engineering team. A quality supplier will respond within 48 hours with a preliminary feasibility assessment, a list of clarifying questions, and a rough budget estimate. Avoid suppliers that send a price without any technical dialogue—they are likely resellers, not manufacturers. Our typical process involves a 1-hour video call with your project engineers to align on critical parameters before we generate a formal proposal.
What to Expect During the Manufacturing Process
Once the order is placed, a professional heavy industry crane supplier will provide a detailed production schedule with milestones: design approval (2–3 weeks), material procurement (3–4 weeks), fabrication and machining (6–8 weeks), assembly and testing (2–3 weeks), and packing (1 week). You should receive weekly progress photos and have the right to request an interim inspection before painting. At our facility, clients are encouraged to witness the factory acceptance test either in person or via live stream.
Ensuring Smooth Logistics and Local Support
Shipping a 100-tonne crane requires careful planning. The supplier should provide a packing list with dimensions and weights of each crate, advise on the optimal Incoterm (FOB, CIF, or DAP), and coordinate with a freight forwarder experienced in heavy lifts. Upon arrival, the installation supervisor should be on site for the entire assembly and commissioning period, typically 2–4 weeks. After handover, ensure you have a local service contact and a clear warranty claim procedure. We provide a 24/7 hotline in English, Spanish, Russian, and Arabic for our heavy industry clients.
The decision to invest in a heavy-duty overhead crane extends beyond the initial purchase; it shapes your operational reliability for decades. By demanding factory audits, material test certificates, and transparent performance data, you safeguard your production against unnecessary risk. Whether you are a distributor building a regional product line or a plant manager upgrading your lifting fleet, insist on a supplier that treats your project as an engineering partnership, not a commodity transaction. If you are sourcing for heavy industries in South America, Russia, Southeast Asia, the Middle East, or South Africa, speak with our engineering team today. We provide detailed proposals, 3D layout drawings, and compliance documentation before you commit a single dollar—because in heavy lifting, trust is built on verified facts, not sales promises.
References and Further Reading
- ISO 9001:2015 Quality management systems — Requirements. https://www.iso.org/standard/62085.html
- ISO 4301-1:2016 Cranes — Classification — Part 1: General. https://www.iso.org/standard/61784.html
- FEM 9.001 Rules for the design of series lifting equipment. https://www.fem-eur.com/
- World Steel Association. Steel Statistical Yearbook 2025. https://worldsteel.org/
- China Heavy Machinery Industry Association. Annual Report 2025. http://www.chmia.org/
- ISO 12482:2014 Cranes — Condition monitoring. https://www.iso.org/standard/61785.html